Sinatra Funeral Homes, 499 Yonkers Avenue, Yonkers, NY

New 2-Story Funeral Home.

Total Floor Area: 6,582 SF
Total Construction Cost: $1,948,500

Wall Street Theatre, 71 Wall Street, Norwalk, CT

Alterations and Renovations to existing Theater.

Total Floor Area: 11,362 SF
Total Construction Cost: $3,662,958

Nutmeg Farms, 1520 Wolcot Road, Wolcot, CT

Alterations and additions to an existing convenience store as well as a new gas pump island and canopy structure.

Total Floor Area: 4,111 SF

3 Fox Hollow Road, Oxford, CT

A proposed new building for Metal Fabricating & Offices.

Total Floor Area: 33,629 SF
Total Construction Cost: $2,518,000

Jennings Oil, 10 Allen Drive, Gaylordsville, CT

New 2-story office building utilizing a pre-engineered metal building structure. The site will house two (2) 30,000-gallon above ground liquid propane storage tanks and piping / dispensing stations.

Total Construction Cost: $791,558

Shattemuc Yacht Club, 1 Westerly Road, Ossining, NY

Removal of three (3) existing sunken barges to be replaced with new floating precast concrete wave attenuators and replacement of floating docks and finger piers. Also included is the removal of nine (9) existing moorings and 25 new moorings.

Total Floor Area: 24,886 SF
Total Construction Cost: $2,121,400

Starr Ridge Farm Equestrian Center, 199 Starr Ridge Road, Brewster, NY

A proposed new Equestrian Center including Main Barn for 48 Horse Stables Indoor Riding Arena, Maintenance Garage with Apartment above and a 4-Bedroom Manager’s Residence with attached 2-car garage.

Total Floor Area: 21,440 SF
Total Construction Cost: $5,536,640

Levy Horse Farm, 42 June Road, North Salem, NY

Indoor riding arena with 16 new stalls and Caretakers residence on site.

Total Floor Area: 17,450 SF
Total Construction Cost: $1,000,000

132 North Avenue, Pleasant Valley, NY

Four (4) buildings each containing four (4) townhouse units. Property condition assessment of the building and grounds.

13 Hayes Road, Elmsford, NY

Construction and demo of a transfer station along with related site improvements and make a C&D recycling/waste complex.

Total Construction Cost: $4,995,514